Organizations need to have the capability for continuity personnel to be fully operational and carrying out Mission Essential Functions at an alternate facility no less than 12 hours after a continuity event. As such, alternate facility locations should be properly equipped with data connectivity and power, and should have enough space for personnel and equipment including computers and furniture. It is recommended that departments create drive-away kits for prepositioning or rapid deployment to the alternate facility.